Flood Management Strategies Flashcards
Card 1 of 16
All 16 cards in this deck
What is hard engineering in river management?
Building artificial structures, such as dams, embankments and flood relief channels, to control the river and reduce flood risk. It is usually expensive and can harm the environment.
What is soft engineering in river management?
Working with nature and natural river processes to reduce flood risk; low cost, low maintenance and little environmental impact.
How do dams and reservoirs reduce flood risk?
A dam traps water in a reservoir, storing it during heavy rain and releasing it in a controlled way; the water also supplies drinking water and HEP.
Give one cost of dams and reservoirs.
Any one of: very expensive to build; the reservoir floods land and displaces people; sediment is trapped behind the dam, so less reaches downstream; fish migration is blocked, damaging habitats.
What is channel straightening, and how does it reduce flood risk?
Removing meanders so the river is shorter and faster, moving water out of the area more quickly; it also improves navigation.
Give one cost of channel straightening.
Any one of: it destroys habitats and changes the river's ecosystem; concrete linings look unattractive; faster flow can increase flood risk downstream; it is expensive to build and maintain.
What are embankments as a flood management strategy?
Raised banks built along the river so it can hold more water and floods less often, protecting buildings on the flood plain.
Give one cost of embankments.
Any one of: high maintenance costs; reduced access to the river; concrete or gabion embankments break up habitats; they look unattractive.
What is a flood relief channel?
An artificial channel that takes excess water around or away from a settlement when river discharge is high; it can also create new aquatic habitats.
What are flood warnings and preparation?
Monitoring rivers and warning people so they can prepare and act; people may not respond, especially after false alarms.
What is flood plain zoning?
Restricting building and development on the flood plain so land at highest risk is used only for low-value uses such as grazing, wetlands or recreation.
What is river restoration?
Returning a hard-engineered river to its natural channel, e.g. removing straightening or levées, reducing discharge downstream and increasing biodiversity.
Give one cost of planting trees to reduce flood risk.
Any one of: the land can no longer be used for farming, so farmers lose income; it takes years before young trees have much effect; deciduous trees intercept less rain in winter when they have lost their leaves.
Give one cost of a flood relief channel.
Any one of: where the channel rejoins the river, discharge rises, which can increase flood risk downstream; it is expensive to build and maintain; construction disturbs habitats and takes up land.
Give one cost of flood plain zoning.
Any one of: it does not protect buildings already on the flood plain; it limits where a settlement can expand; it can lower land and property values on the flood plain; it is hard to apply where land for housing is in short supply.
Give one cost of river restoration.
Any one of: letting the river flood its natural land can increase flood risk locally, e.g. on nearby farmland; farmland is lost to wetland or flood plain; removing existing hard engineering can be expensive.